Future Plan
11th "Five-Year" Environmental Protection Plans
  11th "Five-Year" Environmental Protection Plans
    The environmental protection plans during the 11th five year plan period are sorted into ten categories and the total investments will reach to RMB 189.23 billion Yuan.

I  335 drainage area treatment engineering projects, RMB 16.8 billion Yuan
(i) 252 industrial pollution sources treatment projects, RMB 8 billion Yuan
(ii) 24 reclaimed water withholding, stockpiling, dredging and using projects, RMB 2.8 billion Yuan
(iii) 23 Water purifying and ecology renewing projects in Man-made wetland of important drainage area, RMB 2 billion Yuan
  ★ 21 Water purifying projects, RMB 1.79 billion Yuan
  ★ 2 ecology renewing projects, RMB 0.21 billion Yuan
(iv) 36 model projects of pollution treatment in small drainage area, RMB 4 billion Yuan

II  Air pollution treatment projects, RMB 18 billion Yuan
(i) Desulfurizing projects, RMB 14 billion Yuan
  ★ 80 desulfurizing projects in coal-power plants, RMB 12 billion Yuan
  ★ Desulfurizing projects of industrial boilers, RMB 2 billion Yuan
(ii) Industrial dusting engineering, RMB 4 billion Yuan

III  Engineering of urban waste water treatment, reclaimed water usage and garbage treatment(441 projects), RMB 23.83 billion Yuan
(i) 212 urban waste water treatment projects, RMB 13.93 billion Yuan
  ★ 125 New-built and expand-built urban waste water treatment projects, RMB 9.73 billion Yuan
  ★ 23 pipeline set projects in the existed waste water treatment plants, RMB 1.22 billion Yuan
  ★ 16 dephosphorization and denitrogenation projects in the existed waste water treatment plants, RMB 0.35 billion Yuan
  ★ 48 sludge treatment and reusing projects, RMB 0.33 billion Yuan
  ★ 99 urban reclaimed water re-usage projects, RMB 2.3 billion Yuan
(ii) 130 urban garbage treatment and re-using projects, RMB 9.9 billion Yuan

Copyright◎2006 Shandong Green Exhibition All rights reserved.
Techinical Support: Shandong GOODLINK Environmental Protection International Cooperation Center